ChaimsPlan

To be done by Catherine [C], Gio [G], Louis [L], Mehul [M], Pankaj [P], Ron [R], or [all]

  1. A: DCE, CORBA, OLE running examples [C, M, P] due 1Feb97. Means: executing client and server communicating.(G)
    A.1 Investigate ActiveX [P] due 1Feb97.
  2. B Definition and description of primitives used to implement A (A, B)
  3. C Working Code (A)
  4. D. paper [P,G,R] version 1 done, version for London 16Dec96,
  5. E. High level architecture
    E.1 CMU paper, London paper 18Dec96 [P,R,G]
    E.2 update 1Jul97 [R,G]
  6. F. Room reservation example documented, synchronized
  7. G. Servers for at least 2 examples DCE, CORBA, OLE (3Feb97)
  8. H. Defining features of client stubs [M]
  9. I. Decide on programming language for client stubs 15Mar97
  10. J. More examples (A) [G] 6Jan97
  11. K. Mission statement [R] 6Jan97
  12. L. Define and populate the tables in the client repository.
  13. M Defining the syntax and semantics of CHAIMS in BNF (A)
    M.1 V1. 3Mar97 (A),
    M.2 May97 (H)
    M.3 Jun97 [R]
  14. N. Running examples for dumb demo
  15. O. Low level architecture,
    O.1 Definition of Library interfaces (P1, P2,P3) 15Apr97
    O.2 Other definitions
  16. P Support libraries, for each statement, for creation and invocation. P.1 Created as we go along, for each interface
    P.1.C Library material for DCE [C] 5May96
    P.1.P Library material for OLE [P] 5May96
    P.1.M Library material for CORBA [M] 5May96
    P.2 Moving library contents architecture specs (O.1, P.1) 1Jun97
  17. Q. Dumb demo, equivalent to (N)
  18. S. Progress report update.[C] 6Jan97, 3Feb97, etc first Monday of the month
    S.1 After final some Monday meetings [C] 16Dec06, 3pm; others
    S.2 Get room.[C] 10Jan97
    S.3 Topic participation in DCE, Active-X, CORBA, etc. as they occur [all]
  19. T Automatic repository management LongTerm
  20. U. Major demo [all] 15Sep97
  21. V. Review Meeting 2Apr97 [R organizer, C, G, L, M, P]